Untitled

 avatar
unknown
plain_text
5 months ago
536 B
3
Indexable


"Simulate the process of inspecting items on a production line. There is one inspector available who inspects two different items, A and B, with specific time constraints. Using GPSS, model the flow of items on the line, and calculate the system's performance for a given number of items to be inspected."

SIMULATE
    FUNCTION INSPECTOR 10001
    FUNCTION LINE 9000

    GENERATE 281, 0
    QUEUE LINE
    SEIZE INSPECTOR
    DEPART
    ADVANCE 200
    RELEASE INSPECTOR
    TRANSFER, A, B
    TERMINATE, A
    TERMINATE, B
END




Editor is loading...
Leave a Comment